IHU 60-80(installing hoist unit)
Unit for development and repair of wells
UPRS 40
Unit for well development and workover
Hull elevator
Hull elevator with an upgraded hull
CRDU
UDONGS
CHEMICAL REAGENT DOSING UNIT
Chemical filling device
Production of units for workover and well development
IHU 60-80
  • Lowering and lifting of tubing and drill pipes
  • Well flushing, repair works and works
  • well cleanup operations
  • Drilling out cement plugs in pipes 5-6
  • Installation of production equipment at the wellhead
  • Drilling operations
At this stage we are developing a new model of a hoisting unit with a lifting capacity of 80 tons.
The previously produced unit is refined to the requirements:
DEVELOPMENT AND MAINTENANCE UNIT
UPRS 40
  • Lowering and lifting of tubing and drill pipes
  • Well flushing, repair works and works
  • well cleanup
  • Trapping and other types of work
  • Installation of production equipment at the wellhead
  • Drilling operations
  • Well abandonment services
  • Enhanced Logistics
At this stage, the development of the UPRS 40
оil and gas wells up to 2000 m deep, as well as drilling wells up to 1000 m
SHELL ELEVATOR
An elevator is designed for gripping and holding drill pipe and casing string suspended during round-trip operations in oil and gas well drilling under conditions of temperate and cold (l1 and l2) microclimate regions in accordance with GOST 16350.
Climatic modification Y with ambient temperature from minus 50°С to plus 45°С.
Climatic modification XL with ambient air temperature from minus 60°С to plus 45°С.
Product category I in accordance with GOST 15150.
Technical specifications
Maximum load capacity, tf - 140
Distance between the centers of the eyes under the bars, mm. - 420
Overall dimensions, mm - L*W*H 670*295*260
Pipes, for which the elevator is designed:
a) drill pipes with internally knocked out ends F114 according to GOST 631
b) casing with inside x-plated ends F114 according to GOST 632
Diameter of elevator boring under the pipe, mm 118
CHEMICAL REAGENT DOSING UNIT
CRDU
Designed for chemical treatment of oil and gas well products in oil and gas gathering, transport and treatment systems. It is used at cluster sites, sites of booster pumping stations and integrated oil, gas and water treatment units.
UDONGS
Technical specifications
CHEMICAL FILLING DEVICE
Russia, the Republic of Bashkortostan,
Ishimbay town, Bogdan Khmelnitskogo street, 2
Technical director
+7 901 811-52-00
CONTACTS
Budanov Genady Viktorovich